Changing how the inside of your house works
Finishing a basement, taking out a wall to open the main floor, replacing flooring throughout, upgrading trim and millwork, reworking a laundry or mudroom, or renovating the whole house at once.
The difference between a cosmetic refresh and a real remodel is usually a wall. Once you move or remove them you are into load paths, beams and rerouted mechanical. We build custom homes and additions, so that is ordinary work rather than where the project stalls. Kitchens and baths have their own page.
The cheapest square footage you will ever add is already under your house.
Finishing a basement costs far less per square foot than building an addition, because the foundation, walls and roof already exist. It is also the most code-sensitive interior project we do.
Any basement bedroom needs a compliant egress window or door. If your plan includes a bedroom and the wall does not already have one, cutting a window well into the foundation is part of the project, not an upgrade for later. This is the single most common thing homeowners have not budgeted for.
- Framing, insulation, drywall and finishes
- Egress windows and window wells
- Basement bedrooms, offices and guest suites
- Family rooms and media rooms
- Basement bathrooms and below-grade plumbing
- Wet bars and kitchenettes
- Ceiling height, soffits and duct routing
- Egress-compliant stairs and railings
Interior remodeling services
Update a single room or transform the layout and function of the entire house.
Wall removal and layout
Opening kitchen, dining and living space. Load-bearing evaluation, beams, rerouted mechanical and electrical.
Whole-home renovations
Full interior refresh in one project, or phased in an occupied home. Updating dated floor plans.
Flooring and tile
Luxury vinyl plank, hardwood, tile floors and feature walls, subfloor repair and transitions.
Doors, trim and millwork
Interior doors, baseboard and crown, built-ins and window seats, stair parts and railings.
Drywall, paint and finishes
New drywall and texture matching, removing popcorn ceilings, interior painting, accent walls.
Laundry and mudrooms
Relocating laundry to the main floor, cabinetry and folding space, lockers and boot storage.
Structural modifications
Beams, headers and posts, floor reinforcement, stair relocation, engineering and permits.
Design coordination
Working with your designer or ours, material selection, keeping selections inside the budget.
Accessibility
Widening doorways, removing thresholds, main-floor bedroom conversions, better lighting.
How it runs
Interior work happens in the house you are living in, so sequencing matters as much as the carpentry.
- Phase one
Walk-through
What you want to change and what the structure allows. Load-bearing questions get answered here, not during demo.
- Phase two
Budget and scope
A real number before commitment, with trade-offs laid out so you decide where the money goes.
- Phase three
Engineering and permits
Structural drawings where needed, permits pulled, inspections scheduled. We handle the paperwork.
- Phase four
Build and finish
Containment where we are working, trades sequenced, punch list walked before we call it done.
Questions people ask first
What does it cost to finish a basement in Fort Collins?
Cost is driven by what goes in it, not the square footage. An open family room with carpet, drywall and lighting is the low end. Add a bathroom and the number moves significantly, because below-grade plumbing often means cutting concrete. Add a bedroom and you may be cutting an egress window into the foundation.
The other variable is what is already down there. Exposed ductwork, a low ceiling, a sump pit or a furnace in the middle of the floor all shape what is possible.
Do I need a permit to finish a basement or remove a wall?
Yes to both, in almost every case. Finishing a basement adds habitable space and involves framing, electrical, insulation and often plumbing, all permitted and inspected. Removing a wall requires a permit when it is structural, and determining that is part of the process.
Unpermitted finished basements are a recurring problem at resale. An appraiser may not count the square footage, and a buyer's inspector will usually notice.
Is my wall load bearing, and can it come out?
Most of the time it can. The question is what replaces it. A load-bearing wall carries weight from above, so removing it means a beam sized for that load, with posts and footings capable of taking it to the foundation. That is an engineering calculation, not a guess.
There are clues, like walls running perpendicular to floor joists, but nothing certain from the finished side. Also frequently inside a wall: ducts, plumbing vents and electrical, all of which have to go somewhere else. We evaluate all of it before quoting.
How long does an interior remodel take?
It depends heavily on scope. Flooring or a paint and trim refresh is days. A finished basement or a wall removal with a beam is weeks. A whole-home renovation is months, usually phased so you keep part of the house usable.
Two things stretch schedules more than labor: permit review time and long-lead materials. Both get handled at the front rather than discovered in the middle.
Can I stay in the house during the remodel?
For most interior projects, yes. Basement finishing is the easiest to live through since the work is on a separate level. Flooring, trim and paint move room by room. The harder ones are whole-home renovations and anything taking out your only kitchen or bathroom for long.
Where we are working we contain it: plastic barriers, floor protection on the paths we use, and cleanup at the end of the day rather than the end of the job.
What is the difference between a remodel and an addition?
A remodel reworks space inside the existing walls. An addition creates new square footage, which means foundation work, new exterior structure and a permit tied to a larger footprint.
Finishing a basement sits in between. It adds usable, permitted living space without changing the outside of the house, which is why it is usually the best value per square foot on this page.
Should I test for radon before finishing my basement?
It is worth doing. Much of Colorado sits in a high radon potential zone, and a basement is where levels are highest. Testing before you finish is far easier than addressing it afterwards, because if mitigation is needed the piping has somewhere to run while walls are still open.
Can you take out a popcorn ceiling?
Yes, and it is a common request in homes of a certain age. One thing to know: ceilings installed before the 1980s can contain asbestos, so testing first is the right order of operations. If a test comes back positive, abatement is specialist work and gets handled by a licensed abatement contractor before we start.
Which wall is in your way?
Tell us what you want the inside of your house to do that it currently does not. We will walk it and give you a real number before anything comes apart.